Project 1 : Supply and installation of main distribution system for the new factory building. Including 3.2MVA, 33KV switchyard, MV & LV
Design, supply, installation, commissioning & training of industrial robot education cell (Japan made 6 Axix, 210Kg payload and 3.1 meter reach) &
Supply & installation 5MVA MV Substation, 8000A MDB, Sub DB’s. Supply and installation of Cable management system, laying of feeder cables. Supply